在德国和丹麦之间建立快速轨道

案例分析

作者:Karina Lumholt

Fehmarn Belt固定链接是一条计划的沉浸式隧道,旨在连接德国和丹麦,使旅行者仅在7到10分钟内在国家之间进行火车,或者通过四车道的高速公路行驶。完成后,这个18-kilometre-long tunnelwill be the世界上最大的隧道of its kind and is expected toemploy up to 3,000 people。Fehmarn带固定链接is a user-financed7 billion Euro project, expected to be completed in nearly nine years, that would connect Puttgarden on the German island of Fehmarn and Rødby on the Danish island of Lolland. Along with the Øresund fixed link between Copenhagen and Malmö, the Fehmarn Belt Fixed Link will bring Scandinavia and Central Europe closer through the named North-South corridor.


为隧道做准备

为隧道做准备
这个欧洲大型项目的预备施工工作。

Holbøll A/S这是一家丹麦建筑公司,在私人和公共建筑商的土壤,混凝土,污水和涂料领域进行高质量的工作,在该项目中起着重要作用56个桥梁在Ringsted-rødby线上,丹麦的主要路线穿越丹麦,隧道将开始。Holbøll对这个欧洲大型项目的承诺包括用于新桥梁的排水工作,以及为桥梁建造坡道。总共三年,预计即将完成,这是公司有史以来最大的项目。

The company’s success is based on adapting to the new challenges and changes that the market constantly creates. This approach enabled the company to win the sub contract to support the railway network works between Ringsted and Rødby. With approximately130 employees和一个机器公园配备机器控制的22台机器from Leica Geosystems, Holbøll's delivers innovative and sustainable solutions on time and at the agreed price.

在Vordingborg的其中一个桥梁,操作员Flemming Ove Nielsen使用Leica图标GD4 3D系统on the 61PX Komatsu dozer to do the first rough work for building the slopes.

“The dozer is very efficient for this sort of work because it can move so much dirt and, with machine control, hold the correct angle of the blade,”explains Carl-Ole Holbøll, co-owner and managing director of Holbøll.“弗莱明使用机器控制来创建斜坡,然后挖掘机接管最终的评分工作,”says Holbøll.

推土机的双GNSS解决方案是一个优势,因为斜坡是如此陡峭,为了实现精确的跨斜率,需要双GNSS。

Further down the rail track by5 kilometres, another bridge ramp is under construction. The excavator usesLeica iCON iXE3 3D system对于坡道斜坡的饰面层。操作员已使用该解决方案来记录不同污垢层的高度,只需放置水桶并让IXE3注册ASUILD文档和付款释放的高度即可。这个saves a lot of timebecause the operator doesn’t have to wait for a surveyor to do the as-built documentation for each layer.


Building a greener corridor

Building a greener corridor


Along with the tunnel, the upgrade and expansion of the rail link between Ringsted and Lübeck will deliver a shorter and faster connection. The Fehmarn Belt Fixed Link is part of the European TEN-T network whose objective is to enhance the efficiency of the infrastructure and reduce the environmental impact. The objective of TEN-T is to transfer more freight from roads to rail,reduce energy consumption and ease road congestion。铁路货运基础设施将得到显着改善shortened by 160 km


铺路下一步

铺路下一步
使用推土机进行重型土方工程。

负责的公司女性A/S采取了下一步,开发了将建造隧道元素工厂的区域。持续的考古调查,预备供应基础设施和排水量为55毫米欧元提供了资金。Geared with Leica Geosystems, Holbøll A/S has prequalified for several of the derived projects, including the draining and moving of eight hectares in Strandholm Lake in Denmark

我们的最新消息

Find out about the latest happenings with Leica Geosystems brands.
Find out about the latest happenings with Leica Geosystems brands.

Contact Leica Geosystems

想了解更多吗?我们在这里回答您的问题。

想了解更多吗?我们在这里回答您的问题。

记者86

Download Reporter PDF
Download Reporter PDF

Around the world customer images

Around the world. Any day. Any application.
Around the world. Any day. Any application.