Building a fast track between Germany and Denmark

Case study

Author:Karina Lumholt

Fehmarn带固定链接is a planned immersed tunnel proposed to connect Germany and Denmark, allowing travellers to go by train between countries in only seven to 10 minutes or drive through a four-lane motorway. Upon completion, this18-kilometre-long tunnelwill be theworld’s largest tunnelof its kind and is expected toemploy up to 3,000 people。Fehmarn带固定链接is a user-financed7 billion Euro project, expected to be completed in nearly nine years, that would connect Puttgarden on the German island of Fehmarn and Rødby on the Danish island of Lolland. Along with the Øresund fixed link between Copenhagen and Malmö, the Fehmarn Belt Fixed Link will bring Scandinavia and Central Europe closer through the named North-South corridor.


Preparing for the tunnel

Preparing for the tunnel
Preparatory construction work for this European mega project.

Holbøll A/S, a Danish construction company carrying out quality work in the fields of soil, concrete, sewerage and coating for both private and public builders, plays an important role on this project with the earthworks for56 bridgeson the Ringsted-Rødby line, the main route crossing Denmark leading where the tunnel would start. Holbøll’s undertakings for this European mega project includes drainage work for the new bridges as well as building the ramps to the bridges. With a total of three years, expected to be finished soon, this is the biggest project the company has ever undertaken.

The company’s success is based on adapting to the new challenges and changes that the market constantly creates. This approach enabled the company to win the sub contract to support the railway network works between Ringsted and Rødby. With approximately130 employeesand a machine park of22 machines equipped with machine controlfrom Leica Geosystems, Holbøll's delivers innovative and sustainable solutions on time and at the agreed price.

At one of the bridges in Vordingborg, operator Flemming Ove Nielsen usesLeica iCON GD4 3D systemon the 61PX Komatsu dozer to do the first rough work for building the slopes.

“The dozer is very efficient for this sort of work because it can move so much dirt and, with machine control, hold the correct angle of the blade,”explains Carl-Ole Holbøll, co-owner and managing director of Holbøll.“Flemming uses machine control for creating the slope and then the excavator takes over for the final grading work,”says Holbøll.

The dual GNSS solution for dozer is an advantage because the slope is so steep, and to achieve an accurate cross-slope, dual GNSS is required.

Further down the rail track by5 kilometres, another bridge ramp is under construction. The excavator usesLeica iCON iXE3 3D systemfor the finishing layer of the ramp slope. The operator has used the solution to document the height of the different dirt layers by simply placing the bucket and letting iXE3 register the height for the as-built documentation and payment release. Thissaves a lot of timebecause the operator doesn’t have to wait for a surveyor to do the as-built documentation for each layer.


Building a greener corridor

Building a greener corridor


Along with the tunnel, the upgrade and expansion of the rail link between Ringsted and Lübeck will deliver a shorter and faster connection. The Fehmarn Belt Fixed Link is part of the European TEN-T network whose objective is to enhance the efficiency of the infrastructure and reduce the environmental impact. The objective of TEN-T is to transfer more freight from roads to rail,reduce energy consumption and ease road congestion。铁路货运基础设施将标志ificantly improved because freight between Scandinavia and the rest of Europe would no longer need to drive across Storebælt in Denmark, and the rail freight will beshortened by 160 km


Paving the next steps

Paving the next steps
Using a dozer for the heavy-duty earthworks.

The responsible company, Femern A/S, has taken the next steps developing the area where the factory for the tunnel elements will be built. Continued archaeological surveys, preparatory supply infrastructure and drainage has been financed at 55 millio Euros.Geared with Leica Geosystems, Holbøll A/S has prequalified for several of the derived projects, including the draining and moving of eight hectares in Strandholm Lake in Denmark

Our Latest News

Find out about the latest happenings with Leica Geosystems brands.
Find out about the latest happenings with Leica Geosystems brands.

Contact Leica Geosystems

Want to learn more? We're here to answer your questions.

Want to learn more? We're here to answer your questions.

Reporter 86

Download Reporter PDF
Download Reporter PDF

Around the world customer images

Around the world. Any day. Any application.
Around the world. Any day. Any application.