Monitoring Australia's Biggest Transport Project

案例分析

View of Train at Sydney's Central Station being monitored by a Leica TM50 Total Station

作者:空间来源

‘Tested, tried and proven’ Leica instruments and software highlight the complex system monitoring the tracks and platforms during Central Station’s Sydney Metro upgrade.

Leica Nova TM50的视图监视悉尼中央车站的平台Fig 1. The team utilised 28Leica Nova TM50monitoring stations.

As excavation and construction barrel ahead on the Sydney Metro, Australia’s biggest ever transport project, a small and vital team of engineers have been quietly navigating the crowds and rumbling trains that define Sydney’s Central Station.

They are using state of the art equipment to monitor the tracks and existing infrastructure to make sure the massive works necessary to bring new Metro trains to the 120-year-old Sydney landmark, aren’t endangering the more than 100,000 daily riders that already shuffle through.

That important job was awarded to the team atGLS Monitoring, a joint venture betweenLand SurveysandGeomotion Australia. With an iconic building and the safety of so many riders on the line, the team knew the equipment had to be precise and sturdy enough to withstand the challenges of the busy station.

“值得庆幸的是,我对我们拥有的Leica仪器真的很满意,” GLS监控的仪器和监测经理Szabolcs Fajcsi说。

“We don’t get the call often, but for example the contractor might ring up on a Sunday night saying, ‘OK, can you just please check the south end of track 16 to see if there are any movements on the track that will cause us to stop the trains?’”

“You have to be really, really quick, and ready to make a call before something bad happens,” he says. “But the instruments we use make it really easy to give a reliable answer so that when the client needs you to make the call – you can make the call.”

通过强大而复杂的监控系统,GLS监控团队在分销商的合作伙伴的帮助下开发了这些快速呼叫CRKennedy.


Leica Geosystem's reflector installed across the tracks at Sydney's Central StationFig 2. The team installed more than 4,500 prism reflectors across the tracks and station platforms.

They built a massive network that includes 28 Leica Nova TM50 monitoring stations pointed at more than 4,500 prism reflectors installed across the tracks and station platforms, along with an assortment of other geotechnical sensors.

The team have employedLeica’s GeoMoSMonitoring Software to keep a watchful eye on the trove of data coming in round-the-clock and provide alerts in case it detects any movement outside acceptable limits.

“GeoMoS is one of the more widely used pieces of software across the world, and we are familiar with its data structure and how to extract the information we need,” says Drew Coulthard, National Monitoring Manager with Land Surveys. “When it comes down to it, GeoMoS is tested, tried and proven.”


Leica GeoMoS Monitoring Software setup to monitor any movement at Sydney's Central Station

图3. Geomos监视软件可以保持警惕,并在检测到运动的情况下警报。

Coulthard says the team needed proven precision from each instrument they chose for the project.

“One of the key factors with the Leica Nova TM50s is their ATR (automated target recognition) ability, especially considering all the densely located prisms required for this job,” he says.

他说:“因此,例如,在赛道上,您可能会有三米的棱镜,但是从乐器的视野中,它们看起来非常接近 - 当涉及到每个棱镜时,Leica TM50非常出色。”

“And another major factor with the TM50s is that we know that they are really good hard-wearing instruments that perform well in a pretty tough environment.

”GLS Monitoring’s Szabolcs Fajcsi knows all too well how demanding Central Station can be on both the equipment and the team.

“Well, we have constant maintenance, mainly because with all these prisms on the tracks and the dust at the station, the prisms get dirty every two weeks or so,” Fajcsi says. “So, it’s especially challenging sometimes to find a timeframe where you can jump on the tracks and clean and reinstate those targets with how busy the station can be,” he says.

Fajcsi says the GLS Monitoring team have had very few issues with the Leica TM50 monitoring stations even with the adverse conditions. But, in the very few instances where they units have needed some attention it was a real plus having the CR Kennedy support available at short notice.

他说:“通常将单位带到Cr Kennedy,他们可以为我们提供快速校准或解决方案,通常只需几天的时间,这通常很容易快捷。”

Drew Coulthard with Land Surveys says the age and complexity of Central Station make it an especially exciting, but complicated, site to build at and to monitor. In other words, there is a lot of existing, vital, infrastructure and just about everything has moved over the years – even the tracks.


铁轨手推车提供自动轨道几何监控Fig 4. The Amberg GRP 1000 Rail Trolley provides automated track geometry monitoring.

That is why the team had CR Kennedy supply them with an Amberg GRP 1000 Rail Trolley, which they used to conduct a base survey of the real track conditions and geometry at the start of the project.

Because of the dynamic nature of Central Station, Instrumentation and Monitoring manager Szabolcs Fajcsi says the trolley still tends to get used a few times a month, more than a year into the project.

“We have the monitoring from track eight all the way to track 23 – that is pretty much four kilometres of track in total,” Fajcsi says. “If there is some sort of maintenance on the tracks then we need to do a trolley survey to be able to provide automated track geometry monitoring.”

Land Surveys have purchased at least two more of the trolleys, seeing the value they can bring in projects across Australia including a major rail project for mining giant BHP in the Pilbara and a commuter rail job in Perth.

但是Fajcsi感到满意的是,他的专注力对中央车站的大规模建筑项目进行了训练,并在确保其顺利进行方面的角色。

“This is pretty amazing,” he says. “The amount of excavation that they are doing right under the live tracks without any interruption on the traffic really is just amazing.”

“这是一个非常具有挑战性的environment to do monitoring in, and that just keeps us going.”

Information provided by CR Kennedy.