利用视觉文档避免返工

Case study

作者:Rosie Knox

在美国国家海洋保护区的海滨悬崖上建造最先进的环境科学校园时,1888年创建的总承包商,Swinerton, leveragedMultivista’s visual documentation serviceto capture construction milestones and regular progress throughout this complex state-funded build.

Swinerton’s project manager, Jeff Stephenson, originally planned to leverage Multivista to meet the project’s progress photography requirement but found significant additional benefits throughout the24个月项目.



Avoiding rework and destructive verification delays



As the multi-use facility included both laboratories and offices for school personnel, in addition to progress photos,Multivista’s MEP Exact-Built®service was procured to capture the critical in-wall systems in each room before coverup.

“建筑物中的每个实验室和办公室都需要墙壁橱柜,因此适当的衬里对于案例安装的稳定性至关重要,”Stephenson explains.“在案例安装期间,所有者的代表在休假中不在,他们返回后,他们想确保许多重要的房间安装了每个计划的支持。”

Due to the vital nature of each laboratory, the owner needed visual confirmation that the backing was installed. Stephenson turned to the project’s progress photos toprovide the owner the assurances they needed.

“Instead of slowing the construction process down and tearing out freshly-painted drywall, I used Multivista’s progress photos to show the time lapse of the rooms in question - from wall framing install to final paint,”斯蒂芬森继续。“照片清楚地显示了安装在适当位置的背景。”

“I estimate approximately15,000 USD [13,300 euros] in rework savingsby avoiding the destructive verification that would have been needed to confirm the backing installation - not to mention mitigating the schedule impact of that rework.”

为了避免重新Swinerton杠杆的视觉记录work on the same project soon after.

“我们的项目位于太平洋的海岸线上,该海岸线将所有建筑元素暴露于腐蚀性,盐水的氛围中,我们的检查员注意到在工作地点上的一些裸露钢生锈。我们取出了著名的生锈,画家向前迈进了钢铁的绘画。”斯蒂芬森说。

When the inspector returned to the project site and questioned the rust removal, Stephenson showed the inspector Multivista’s date-stamped and location-indexed images captured the day after the rust was removed.

“As a result of the photos, we did not need to stop the painter’s progress,”Stephenson explains.“我估计返工的节省12,000美元,避免脱衣和重新粉刷证明锈蚀的钢被清除了。”


激光专注于构建



With remote project stakeholders involved, providing regular project updates was critical. Multivista’s team of construction documentation specialists captured approximately12,000个进度和里程碑图像, which allowed Swinerton to分享实时建设进度without tying up critical resources.

“拥有Multivista也至少每周节省了我们的PES,在整个项目的过程中拍照并将其上传。我估计节省10,000美元的薪水时间over the life of the project,”说明斯蒂芬森。

“所以就在这三个项目上,我们savings total almost 40,000 USD这没有考虑到我们保存了能够虚拟导航的时间by pinpointing exact locations based on your project mapping.”

Our Latest News

Find out about the latest happenings with Leica Geosystems brands.
Find out about the latest happenings with Leica Geosystems brands.