利用视觉文档避免返工

Case study

Author:罗西·诺克斯(Rosie Knox)

When building a state-of-the-art environmental science campus on the seaside bluff of a national marine sanctuary in the United States, 1888-founded general contractor,Swinerton,杠杆Multivista’s visual documentation service在这个复杂的国家资助的建筑中捕捉建筑的里程碑和定期进步。

Swinerton’s project manager, Jeff Stephenson, originally planned to leverage Multivista to meet the project’s progress photography requirement but found significant additional benefits throughout the24个月项目



避免返工和破坏性验证延迟



As the multi-use facility included both laboratories and offices for school personnel, in addition to progress photos,Multivista’s MEP Exact-Built®在掩盖之前,采购了服务以捕获每个房间中每个房间的关键内壁系统。

“建筑物中的每个实验室和办公室都需要墙壁橱柜,因此适当的衬里对于案例安装的稳定性至关重要,”Stephenson explains.“在案例安装期间,所有者的代表在休假中不在,他们返回后,他们想确保许多重要的房间安装了每个计划的支持。”

Due to the vital nature of each laboratory, the owner needed visual confirmation that the backing was installed. Stephenson turned to the project’s progress photos to为所有者提供所需的保证

“Instead of slowing the construction process down and tearing out freshly-painted drywall, I used Multivista’s progress photos to show the time lapse of the rooms in question - from wall framing install to final paint,”Stephenson continues.“照片清楚地显示了安装在适当位置的背景。”

“我估计15,000 USD [13,300 euros] in rework savingsby avoiding the destructive verification that would have been needed to confirm the backing installation - not to mention mitigating the schedule impact of that rework.”

Swinerton leveraged the visual records to avoid rework on the same project soon after.

“我们的项目位于太平洋的海岸线上,该海岸线将所有建筑元素暴露于腐蚀性,盐水的氛围中,我们的检查员注意到在工作地点上的一些裸露钢生锈。我们取出了著名的生锈,画家向前迈进了钢铁的绘画。”斯蒂芬森说。

When the inspector returned to the project site and questioned the rust removal, Stephenson showed the inspector Multivista’s date-stamped and location-indexed images captured the day after the rust was removed.

“由于照片的结果,我们不需要停止画家的进度。”Stephenson explains.“我估计返工的节省12,000美元,避免脱衣和重新粉刷the steel to prove the rust was removed.”


Laser focus on the build



涉及远程项目利益相关者,提供定期的项目更新至关重要。Multivista的建筑文档专家团队大约抓获了12,000个进度和里程碑图像, which allowed Swinerton to分享实时建设进度without tying up critical resources.

“Having Multivista also saved our PEs at least a couple hours a week, taking pictures and uploading them throughout the duration of the project. I estimate a savings of about10,000美元的薪水时间over the life of the project,”explains Stephenson.

“所以就在这三个项目上,我们储蓄总计近40,000美元这没有考虑到我们保存了能够虚拟导航的时间通过根据您的项目映射来查明确切位置。”