PROJECT:捕获Gotthard Base隧道的所有基础设施,以供备用文件
顾客:Grunder Ingenieure AG
PRODUCT: Leica Pegasus:Two
OBJECTIVE:Grunder Ingenieure AG签订了合同,以提供Gotthard Base隧道的完整库存和制作的文件,而无需破坏正在进行的建筑

Grunder Ingenieure AG was contracted to deliver a complete inventory and as-built documentation of the Gotthard Base Tunnel. UsingLeica Pegasus:Two,该公司能够在短短几周内有效捕获整个项目,而不会破坏正在进行的建筑并使所有工作利益相关者受益。该公司选择了Pegasus:两个用于捕获新建造的开放式轨道的基础架构安全有效地使工程师能够使用最准确的表示。

下载完整的案例研究以获取更多信息


When the Gotthard Base Tunnel officially opened in June 2016 as part of the New Rail Link through the Alps (NRLA), a construction project 20 plus years in the making at 9.8 billion Swiss francs yielded the world’s longest and deepest traffic tunnel. At 57 kilometres long and with a rock overburden of 2,300 meters, the tunnel increases the total transport capacity across the Swiss Alps while reducing passenger travel time between northern and southern Europe by one hour. With minimal gradient and wide curves, the route is also a flatter, lower-level journey at only 550 m above sea level. The whole tunnel system measures a total of 152 km, plus almost 50 km of newly built outdoor tracks.

When Grunder Ingenieure AG, a leading Swiss engineering firm specialising in rail surveys and long-time user of Leica Geosystems solutions, was sub-contracted by the Alptransit Gotthard AG, the firm knew it would be a challenging task but one for the history books. One of the main tasks, before the tracks opened for the test operation, was to capture all the infrastructure of the tunnel for as-built documentation.

Sharing information with stakeholders


“There are several stakeholders working on the overall project, and we were tasked with registering the entire infrastructure to collect for the infrastructure database of the Swiss Federal Railways. All these users can now access this information,” said Gilbert Roulier, Grunder’s director of imagining, laser scanning and mobile mapping.

收集铁路资产信息


The firm selected the Pegasus:Two to capture the entire infrastructure of the newly built open tracks safely and efficiently. In combination with Leica Geosystems total stations, Grunder was able to provide a complete database of 3D imagery and point clouds covering the rails, signage, posts, electrical lines, and further installations and structural elements.

想了解有关我们的移动映射解决方案的更多信息吗?请与我们的团队联系以获取更多信息或请求演示。

Transportation

Enabling mapping of transport infrastructure

用于运输基础设施映射的移动3D解决方案可以快速,安全的结构和资产数字化,同时减少测量时间和交通中断。

是否想了解有关捕获Gotthard Base隧道的所有基础设施的更多信息?下载完整的案例研究。

leica_pegasustwo_rightrail_626x337

Leica Pegasus:Two

The vehicle-independent fast and efficient mobile sensor platform reduces your time in the field and opens new business opportunities.