BIM工作流程的更轻松整合 - 新的Leica Icon Build v3.5的积极客户反馈

Q&A with Leica iCON build product subject matter experts

Leica Icon Buld v3.5

2017年4月,Leica Geosystems发布了最新Leica图标构建领域软件3.5版本,以及新的冷杉st-of-its-kind Layout Objects app. The new field software is a major step in facilitating layout tasks on site.

Both, BIM detailers and BIM coordinators, and construction professionals like foremen, layout specialists or construction surveyors can significantly benefit from the new Layout Objects app. It gives the opportunity to streamline their BIM processes and facilitate and speed up their work by transferring BIM objects from the design desk directly to the field tablet without any data conversion and use fully rendered design models in the field.

我们已经与代表Leica Geosystems分销伙伴的Andrew Ricci进行了交谈平整设备服务(LES)在爱尔兰的塞尔布里奇和西蒙·特里斯勒(Simon Tritschler)BAM Contractors Ireland, to learn about their first experiences with the new iCON build v3.5 field software.

安德鲁,您是否已经收到了一些客户对新软件的反馈?

Andrew Ricci:Yes, we have several customers who have tried the software out in the field and others who are already implementing it into their workflows. To sum it up, the feedback is extremely good. From this we have got some very valuable feedback on how the software could be further developed. Simon Tritschler, representing BAM Contractors, is one of these customers.

What do you think about the use ofIFCdata and fully rendered models in the field?

Simon Tritschler:使用IFC数据大大减少了在我们将点的特定图形文件中产生的转录错误或错误中生成的错误。此外,信息传输到调查工具中还有很大的时间节省时间。在现场进行完整的模型可以使现场工程师更加了解该项目,并使他们能够看到未来的潜在施工挑战。

Andrew Ricci:From our point of view as a Leica Geosystems distribution partner, the use of IFC data directly in the field is the only logical step for those who want to integrate BIM thinking thoroughly into their processes and exploit the full potential of BIM.

Simon, how do you handle the dataflow or how do you expect it to be?

Simon Tritschler:我们已经在努力将新的质量驱动工作流程集成到我们的BIM 2级认证过程中。直接从模型中使用IFC使该集成变得更加容易,因为数据路径更清洁,并且结果调查报告文档将使质量循环重新回到通用数据环境中。

What positive effects have you already experienced or do you expect from the new software?

Simon Tritschler:

一个。清洁数据传输。
b。站点工程师的准备时间减少。
c. Enhanced model awareness for site engineers.
d. Increased time on site for site engineers.

Andrew Ricci:对我们来说,现在很重要的是,关于新的革命性图标构建3.5软件的消息,并向我们的客户展示他们在将其实现为BIM流程中可以实现的巨大优势。一旦证明,图标构建了3.5个就引起了客户的极大兴趣。

您认为改进应用程序的下一步应该是什么?

Simon Tritschler:改进的分区/拳击将大大提高最终用户体验并提高生产率。

西蒙·特里什特勒(Simon Trishtler)
Simon Tritschler
技术部署专家VDC
(Virtual Design Construction)
at BAM Contractors Ireland
Andrew Ricci
Andrew Ricci
Technical Sales and Support
at Levelling Equipment Services
Celbridge, Ireland

要了解有关新图标构建软件的更多信息website或者Leica iCON YouTube channelor contact your localLeica Geosystems distribution partner安排a demonstration.

Leica Captivate

Immersive 3D field software to capture and manage data.
Immersive 3D field software to capture and manage data.

Case Studies

阅读来自世界各地的客户如何使我们的各种解决方案付诸实践以塑造明智的变化。
阅读来自世界各地的客户如何使我们的各种解决方案付诸实践以塑造明智的变化。

Contact Leica Geosystems

找到您的Leica Geosystems联系,以获得销售,支持和技术服务。
找到您的Leica Geosystems联系,以获得销售,支持和技术服务。