用新的打桩解决方案独立节省时间和工作

Case Study

Author: Karina Lumholt

过去五年的建设工程的一部分idening and modernising the highway ring outside of Berlin, Germany, the international哈国集团签约Arkil A/S, one of Denmark's largest contracting companies. Arkil Fundering is tasked to prepare the soft base course with concrete piles, ensuring the ground layer is able to carry the weight of the new highway lanes.

Specialised in foundation and marine works, Arkil Fundering has been working for five months on the project piling 3,500 piles to stabilise the soft and sanded ground. Arkil Fundering and its German subsidiary, Specialtiefbau, worked with two piler rigs equipped with the new徕卡图标iRP3机器控制解决方案徕卡MC1软件。

We don’t need a surveyor to stake out the piles manually,“直到LeveRüscher,项目经理。“我们现在可以平均每天开车25-50桩,具体取决于桩的长度,以及地下的柔和程度,“LeveRöscher说。“机器控制解决方案允许我们每桩节省5至10分钟。

直到LeveRöscher担任柏林施工现场的项目经理。

随着打桩解决方案的自动笔划注册,团队通过在堆上没有手动测量测量师来保存时间。


自动寻找桩

RenéVesergård担任柏林的机器运营商。

像这样的地面稳定项目始于岩土工业公司的地下土壤的检查。ARKIL A / S对岩土专家进行了测试堆,然后将桩在桩图案中的坐标计算,并将这些坐标直接发送给MC1软件。

桩的3D位置显示在机器内部机器控制面板上。新软件使运营商能够使用滤芯或拆分屏幕视图,以彩色代码和靶向窗口视图。用户友好的图形指导操作员将打桩机的塔导航到正确的位置。

René Vestergaard, machine operator at Arkil A/S has been working with the new iRP3 solution, explains his workflow, “我发现桩图案上的桩数概述,机器控制解决方案可以自动找到最近的桩Auto Snapfunctionality在机器控制之前,在软砂中工作时,物理佩格可以很容易地移位。现在,在等待带传统测量设备的验船师的同时失去时间,如果桩出现问题,我可以轻松地移动到另一个地方,“vestergaard说。


将数据文件从丹麦发送到德国的机器

Mads D. Raunskov works as head of department (Pile Driving/Drilling & Tunneling) at Arkil A/S.

The introduction of the MC1 software for rigs includes the connection withLeica ConX, a cloud-based web interface for sharing and visualising project data.

Arkil A / S的部门负责人Mads D Raunskov解释了数字连接的优势,“普勒团队现在可以独立工作。我们可以将丹麦的数据文件发送到德国的机器,操作员可以立即开始工作。

Machine operator, Jan Vedel works in the heavy construction industry for more than 30 years and operates piler rigs for the past four years. He benefited from the remote support through Leica ConX several times. In case he needs remote help, a teammate back at the office in Denmark can directly access the control panel on the machine and support Vedel.

After driving a pile into the ground, the operators log each pile in the iRP3 solution. Then, the information is sent via ConX to the office, generating a piler report that serves as as-built documentation.

Jan Vedel在重型建筑行业拥有30年的经验。

The machine control solution for piler rigs enables foremen and machine operators to work independently and productively as a team on a heavy construction site even far away from the headquarter.