Leica图标IGD3 - 3D解决方案

智能的3D分级解决方案

Leica IgD3溶液

Leica图标iGD3 grading system will revolutionise the way you move dirt and fine-grade. The 3D solution brings design surfaces inside the cab. Work independently, and accurately, anywhere on the project design guided by a GNSS system or a robotic total station. iCON grade iGD3 system for dozers can dramatically increase machine use, productivity and optimise material on any earthmoving and fine-grading contract. The system can be used with a wide range of sensors and combines ease of use, flexibility and an intuitive user interface.

解决方案集成Leica ConX这使您可以轻松地在办公室和机器之间传输数据传输,远程通信,车队管理以及通过CONX网站进行生产力分析。

狮子座级别的黑篮

一左右


通用的3D软件平台和通用软件Leica MC1提供了一种非常灵活的解决方案,该解决方案可在工作现场的舰队的几台机器上使用。

Intuitive user interface


The new MC1 software has a clean and simple design with all relevant functions made easily accessible directly in the run screen. Select different run screen views to fit your needs and the requirements of the job site.

灵活性


快速且成本效率地配置3D机器控制解决方案,以满足手头任务的要求。使用所有机器的一个平台来降低车队的复杂性,并更好地利用组件。

Seamless data sharing


Seamless integration between all Leica Geosystems’ solutions, flexible data creation and open data format strategy ensures versatility and high usability for the customer.


下载图标

与我们联系有关机器控制的

Get in contact with us for more information about our machine control solutions.
Get in contact with us for more information about our machine control solutions.

体验自由

The new redefining On-Cab solution gives the operator worry-free dozer control.

体验自由

The new redefining On-Cab solution gives the operator worry-free dozer control.

新的多合一机器控制平台

Leica Geosystems为重型建筑行业提供了智能,直观的硬件和软件组合。

Leica Geosystems为重型建筑行业提供了智能,直观的硬件和软件组合。

VIDEO TESTIMONIAL

Video testimonial

智利ICAFAL通过3D机器控制改变了工作流程。

Video testimonial

智利ICAFAL通过3D机器控制改变了工作流程。

Dozers的CAB配置

驾驶室配置避免了外部桅杆和电缆,并为操作员提供更好的可见性。

驾驶室配置避免了外部桅杆和电缆,并为操作员提供更好的可见性。

案例分析

Landmark Calling Company Inc.分享了其与Leica Geosystems的机器控制系统合作的经验,以及与过去使用的保守方法相比,该公司如何改善和大幅加速施工过程。

Landmark Calling Company Inc.分享了其与Leica Geosystems的机器控制系统合作的经验,以及与过去使用的保守方法相比,该公司如何改善和大幅加速施工过程。